You are here

Western Midland Railroad

Superintendent----------------------------------------------- Mike Chandler MMR
Prototype Location------------------------------------------ Montana
Interchange----------------------------------------------------NP,GN,Milwaukee
Size---------------------------------------------------------------20 feet x 24 feet
Scale--------------------------------------------------------------HO
Era----------------------------------------------------------------1938
Control-----------------------------------------------------------DCC Lenz
Clock Speed--------------------------------------------------- 6:1
Session Length------------------------------------------------3 hours
Crew Size------------------------------------------------------- 12
Dispatching-----------------------------------------------------Timetable and Train Order
Car Forwarding------------------------------------------------CC&WB
Communication-----------------------------------------------Telephones
Jobs-------------------------------------------------------------- Dispatcher, Agent/Operators
Accessibility----------------------------------------------------Basement Down Stairs
Website---------------------------------------------------------- none

The freelanced Western Midland may best be described as a short line built to class one standards. Trains operate point-to-point between two terminal yards over a 170 foot mainline. Although the layout is only about 55 percent sceniced it is fully operational and usually accommodates a crew of 12. In addition to a dispatcher, crew positions include: yardmasters (two), agent/operators (four), as well as several train crews. Train movements during a typical operating session will usually comprise two passenger trains, two through freights and six way freights which are run as extras. While the Western Midland has a dispatcher's office in a room adjacent to the layout, we usually dispatch over the phone from Calgary, Alberta using a former professional dispatcher from the T.T.&T.O. era on Canadian Pacific.
The layout and its dispatching procedures were featured in the July 2012 Railroad Model Craftsman